Fast Charge California Project Window 3

Application Window: February 24, 2027 – May 27, 2027

Statewide
DC fast chargers (DCFC)
Up to $55,000 per Charging Port

Project Overview

  •   Funding will be awarded on a first-come, first-served basis to ready-to-build projects (issued permit and final utility service design).
  •   Fast Charge California Project provides incentives for purchasing and installing eligible direct current (DC) fast chargers.
  •   Incentives are available for project sites across California.
  •   Applicant must be both the incentive recipient and owner of the charging equipment.
  •   Incentives can cover up to 100% of total approved costs.
  •   All incentives will default to $55,000 per charging port as long as the eligible equipment meets the minimum 150kW power level. (The 275 kW+ incentive category is no longer eligible in FCCP-3).
  •   J3400 and CCS connectors eligible, with one CCS connector required per site.
  •   Eligible sites must be available to the public.
  •   Charging hubs, hotels, and business districts will no longer be eligible site types.
  •   All projects must abide by AB2061 data reporting requirements as dictated by the CEC.
  •   Disadvantaged communities (DACs) and low-income communities (LICs) are NOT REQUIRED, but DAC/LIC and tribal applications that meet ready-to-build requirements will be prioritized.
Incentives for eligible equipment may equal up to 100% of the projects’ total approved costs subject to the incentive caps listed. Total approved costs may include equipment, installation, planning, engineering, etc.
Guaranteed Output
(per charging port)
Incentive
(per charging port)
150 kW + $55,000

Full webpage to be released at a later date.