× CALeVIP anticipates launching a new incentive project for DC fast chargers throughout California in 2025. Installation sites will not need to be in a disadvantaged or low-income community to qualify for funding. For the latest updates on upcoming projects, subscribe to CALeVIP emails or visit our Upcoming Rebates page.

What are the charger/installation site types?

Charger/installation site types refer to the following:

  • New: No electrical infrastructure is in place. Conduit installation is acceptable.
  • Stub-out: Includes at least 2-inch minimum spare conduit run with pull rope that is sized, installed and located per the National Electrical Code for future installation of wiring supporting up to a 480-volt AC, 4-wire, 125-kilowatt (kW) load.
  • Replacement/Make-ready: Existing site wired with all the electrical infrastructure needed to support the installation of EV charging.