We recognize that EV charger installations require coordination across multiple organizations, which may be impacted by closures or reduced capacity due to COVID-19 concerns. If you anticipate delays beyond your project’s expiration date due to these issues, please contact us. Extensions will be granted on a case by case basis.

What are the charger/installation site types?

Charger/installation site types refer to the following:

  • New: No electrical infrastructure is in place. Conduit installation is acceptable.
  • Stub-out: Includes at least 2-inch minimum spare conduit run with pull rope that is sized, installed and located per the National Electrical Code for future installation of wiring supporting up to a 480-volt AC, 4-wire, 125-kilowatt (kW) load.
  • Replacement/Make-ready: Existing site wired with all the electrical infrastructure needed to support the installation of EV charging.